PLANNING | ENGINEERING | MANAGEMENT
"To provide responsive, innovative and effective solutions that improve quality of life."

Projects

Projects | Transit | SR-710 Gap Project Report

SR-710 Gap Alternatives Analyses and Project Report Preparation

The CH2M Team is responsible for conducting alternatives analyses, technical assessments, modeling, conceptual and preliminary engineering, public involvement and community outreach support, and environmental studies to prepare a project report and appropriate environmental documents for the SR 710 Gap. The 710 Gap is a regionally significant project needed to close the current highway system gap between Interstates 10 and 210 in Los Angeles and Pasadena, California, respectively. JMD is currently developing Transportation Systems Management/ Transportation Demand Management (TSM/TDM) alternative, a nearly 7-mile light rail transit (LRT) alternative and a 10-mile bus rapid transit (BRT) alternative to provide service between East Los Angeles and Pasadena in lieu of a highway connection. JMD's has designed roadway, interchange, LRT and BRT alignments and stations as well as intersections, roundabouts, parking and maintenance facilities.

View Larger Map
Project Details
Client

Metro

Markets
  • Transportation
Sevices
  • Planning
Disciplines
  • Traffic
  • Transit
  • Civil
  • Rail
  • Highways